Southern Divisions

Southern Railway – Divisions at a Glance

Southern Railway (SR) is the oldest of the 19 Indian Railways zones and is headquartered at Chennai (Royapuram).
It was carved out of the erstwhile Madras & Southern Mahratta Railway (MSMR) on 14 April 1951.

1. Constituent Divisions

DivisionHQStates CoveredRoute km (2023)Key Sheds & Workshops
ChennaiChennai CentralTN, AP992Basin Bridge (EMU), Perambur Carriage & Loco Works
TiruchirappalliGolden RockTN1 063Golden Rock (Diesel), Ponmalai (Wagon)
MaduraiMaduraiTN1 005Diesel & Electric Trip Sheds
PalakkadPalakkad Jn.KL, TN588Diesel Loco Shed (ERS-PLKD section)
SalemSalem Jn.TN, KL, AP794Electric Loco Shed (opened 2018)
ThiruvananthapuramThiruvananthapuram CentralKL625TVC Electric Loco Shed, Kollam MEMU Shed

Total route km of SR (all divisions) ≈ 5 077 km (BG – 100 %; electrified – 98 %)


2. Technical & Operational Specifications

ParameterValue
Traction mix100 % electrified (last stretch → 2022)
Max. sectional speed130 km/h (Chennai–Vijayawada & Chennai–Guntakal)
SignallingAutomatic block on Chennai suburban; CBI, Electronic Interlocking on main line
Train mgmt.TMS (Tiruchchirappalli–Madurai), ACD, GPS-enabled “FogPASS”
Freight basketCoal (NTPL, NLC), limestone, cement, containers (ICD-Tondiarpet, Coimbatore), food-grains
Rolling stock holding (2023)1 096 electric locos, 188 DEMUs converted to MEMUs, 4 731 coaches
Rake maintenance50 trip sheds, 4 pit lines per division avg.

3. Historical Milestones

  • 1853 – First steam run in South India: Royapuram–Walajah Road (Red Hill Railway)
  • 1856 – Madras–Arakkonam (M&SM Railway) – 69 km – first BG line in SR
  • 1874 – Madras–Tuticorin port line completed – vital for cotton export during American Civil War
  • 1891 – Palakkad–Podanur chord opened – shortest Calicut–Madras route
  • 1927 – Perambur Carriage Works set up – oldest integrated workshop in SR
  • 1931 – Madras Electric Suburban service started (3rd oldest after Mumbai & Kolkata)
  • 1956 – Erstwhile Madras Railway merged with SR at formation
  • 1969Pamban Bridge (2.06 km) – India’s first sea bridge for rail ( metre-gauge then) converted to BG in 2007
  • 1979Nilgiri Mountain Railway (NMR) UNESCO tag (toy train – rack & pinion)
  • 1998Konkan Railway Corporation opened – SR gets shortest Mumbai–Trivandrum route
  • 2018 – Salem ELS commissioned – first 12 000 HP “WAG-12” locos allotted to SR
  • 2022RailSpring QR-based coach maintenance app piloted at Basin Bridge
  • 2023Amrit Bharat (Rs 800 cr) sanction for Chennai, TVC & Trichy stations under ADIP scheme

4. Current Status & Recent Updates (2023-24)

  1. K-RIDE (Kerala Rail Infrastructure Dev. Corp.)– SR running 532 km “Silver Line” planning – semi-high speed (200 km/h) – DPR with KRCL.
  2. Trivandrum–Kasaragod Vande Bharat Express flagged off (Apr-23) – SR’s first VB – 6:15 h vs 9 h Shatabdi.
  3. Chennai Suburban 4th line between Korukkupet–Attipattu (28 km) completed – 140 EMU services added.
  4. Golden Rock sanctioned Hybrid LOCOTROL facility – remote loco operation for long-haul freights.
  5. Madurai–Bodinayakkanur BG conversion (90 km) – 85 % complete – expected 2025.
  6. Rameswaram – new Ro-Ro jetty & Pamban vertical-lift span (2024) – 2.0 km bridge – Navayuga Engineering–RVNL joint venture.
  7. Salem–Karur doubling (83 km) – 60 % earthwork over – to ease Erode choke.
  8. Trivandrum coaching terminal expansion – 4th pit line added – capacity ↑ 40 %.

5. Quick-Fire Data Capsule (RRB-favourite)

  • Longest platform in SRShoranur (8B) – 1 086 m
  • Highest rail pierPamban – 64 m (new vertical-lift span)
  • Deepest gradientNilgiri Mountain – 1 in 12 (rack section)
  • Busiest freight lineGuntakal–Renigunta (coal & iron ore)
  • Only rack railwayNMR (Mettupalayam–Udagamandalam)
  • EMU carsheds – Avadi, Tambaram, Velachery, Korukkupet, Tiruvallur
  • MEMU carsheds – Kollam, Palakkad, Madurai, Salem
  • International borderThiruvananthapuram division touches Kanyakumari – closest rail head to Sri Lanka (25 km)
  • World Heritage RailNMR & Kalka–Shimla (but only NMR is in SR)

6. 15+ MCQs – Southern Divisions

1. Headquarters of Southern Railway is located at

Answer: Chennai (Royapuram)

2. Which division of SR has the longest route-kilometre?

Answer: Tiruchirappalli (≈ 1 063 km)

3. India’s first sea rail bridge “Pamban” lies in which SR division?

Answer: Madurai

4. The electric loco shed at Salem was commissioned in

Answer: 2018

5. Which of the following workshops is the oldest in Indian Railways?

Answer: Perambur Carriage Works (1927)

6. UNESCO World Heritage “Nilgiri Mountain Railway” belongs to which division?

Answer: Salem

7. The first Vande Bharat Express of SR runs between

Answer: Thiruvananthapuram–Kasaragod

8. Which is the only rack-and-pinion section in SR?

Answer: Mettupalayam–Coonoor

9. The divisional headquarters “Golden Rock” pertains to

Answer: Tiruchirappalli

10. The deepest gradient (1 in 12) in SR is found on

Answer: NMR rack section

11. Which of the following is NOT a division of SR?

Answer: Guntakal (it is under SCoR)

12. India’s first BG electrified suburban service started in SR during

Answer: 1931 (Madras Beach–Tambaram)

13. The “Silver Line” semi-high-speed corridor of Kerala is to be executed by

Answer: K-RIDE (Kerala Rail Infrastructure Development Corporation)

14. The electric loco shed at Basin Bridge falls under which division?

Answer: Chennai

15. The longest platform of SR, Shoranur (1 086 m), is in

Answer: Palakkad division

16. The new vertical-lift span of Pamban bridge will have a navigational clearance of

Answer: 22 m (from present 17 m)

17. Which SR division touches the maximum number of states?

Answer: Salem (Tamil Nadu, Kerala, Andhra Pradesh)

18. The MEMU carshed at Kollam is under administrative control of

Answer: Thiruvananthapuram division


Revision tip: Map the 5 divisions + Nilgiri Mountain on a blank south-India outline; mark sheds, workshops, ports & ghats – 80 % location-based MCQs solved!